Trying to make some more progress on Josh's CJ. Keith's got a 220v generator with twist lock plug and a propane heater he can bring out to the shop. He just got a big shipment of stuff yesterday.
The next thing we need to do is rebuild the skid/cross member. Keith has some 2" square tubing and we can re-use the old mount and rework it, but we need someone to weld here (I can stick stuff to stuff, but we'd like this to actually be beefy and look fairly good at the same time). Keith has a 110v MIG he can bring as well. Spune? Kevin? T-rav? Ben? Any of you available this weekend by chance?
Once the cross member is in, we can bolt up the new Genright gas tank & skid that Genright has donated, and plumb the fuel lines. If anyone needs a Kilby skid for a YJ, Keith has an extra he'll make you a deal on so we don't have to ship it back...
Once the fuel's done, we can plumb the rest of the brake lines along the frame, and get the tub back on the frame.
Then we can weld up the Poison Spider cage that they've donated to the cause.
After that, we can button up the seats, steering, shifters, etc.
Then we can deliver it to Scott to wire & test fire the motor.
Once that's one, we'll be able to drop drive shafts in, finish the exhaust, and button up the final details.
Now that we've got a plan, I know there are a LOT of events between now and April, when Josh returns from Afghanistan. Frostbite, SMORR Froze Over, parades, St. Patty's day, Big Meats in Disney, etc. But if anyone can squeeze a day in here or there and bring some expertise to the project, that would be awesome!
Please PM me if you can weld and can help tomorrow or Sunday. We'd like to get the cross member done so we can get the body back on the Jeep ASAP. We'll have a heater fired up in the shop. :)
Thanks!
Rich
The next thing we need to do is rebuild the skid/cross member. Keith has some 2" square tubing and we can re-use the old mount and rework it, but we need someone to weld here (I can stick stuff to stuff, but we'd like this to actually be beefy and look fairly good at the same time). Keith has a 110v MIG he can bring as well. Spune? Kevin? T-rav? Ben? Any of you available this weekend by chance?
Once the cross member is in, we can bolt up the new Genright gas tank & skid that Genright has donated, and plumb the fuel lines. If anyone needs a Kilby skid for a YJ, Keith has an extra he'll make you a deal on so we don't have to ship it back...
Once the fuel's done, we can plumb the rest of the brake lines along the frame, and get the tub back on the frame.
Then we can weld up the Poison Spider cage that they've donated to the cause.
After that, we can button up the seats, steering, shifters, etc.
Then we can deliver it to Scott to wire & test fire the motor.
Once that's one, we'll be able to drop drive shafts in, finish the exhaust, and button up the final details.
Now that we've got a plan, I know there are a LOT of events between now and April, when Josh returns from Afghanistan. Frostbite, SMORR Froze Over, parades, St. Patty's day, Big Meats in Disney, etc. But if anyone can squeeze a day in here or there and bring some expertise to the project, that would be awesome!
Please PM me if you can weld and can help tomorrow or Sunday. We'd like to get the cross member done so we can get the body back on the Jeep ASAP. We'll have a heater fired up in the shop. :)
Thanks!
Rich